خطة التدريب

تفاصيل الدورة

تصميم اكمال الابار

Well Completion 

  • Definition & introduction of well completion.
  • Completion methods
    1. Open hole completion
    2. Cased hole completion
    3. Gravel back completion
  • Completion accessories
  • Production Packers
  • Expansion Joint
  • Circulation Equipment
  • Downhole Safety Valves
  • Nipple Profiles
  • Tubing Hangers
  • Wellheads
  • XMAS Tree
  • Other Mechanical Equipment in the Completion String
  •  WELL COMPLETION FOR HORIZONTAL WELL .
  • TEST & EXRCISE OF WELL COMPLETION

WELL COMPLETION : Principles & Procedures

  • Barrier
  • Well Integrity
  • API Definition of Pressure Classes
  • Valve Operation in Flowing Wells
  • Methods of Pressure Control
  • Problems
  • Management of Operations
  • TEST & EXRCISE OF PRINCIPALES & PROCEDURES

COMPLETION & Wireline APLICATION

  • Surface Related Equipment for Pressure Control for Wireline Operations
  • Stuffing Box
  • Lubricator
  • Wireline BOP
  • Shear/ Seal BOP
  • Grease Injection Control Head
  • Pressure Testing & Operation
  • Perforation during the Well Completion
    • Perforation types
    • Standards test for guns
    • Gun types and its equipment
    • Pressure control equipment
    • Perforation for optimum recovery
    • Effective perforation
    • Perforations cleaning methods
  • FORMATION DAMAGE
  • REASONS FOR FPRMATION DAMAGE
  • FORMATION DAMAGE SOLUTIONS

.